![]() | ![]() | ![]() |
The solid paint film of Today's wall paint is crosslinked with water-based high hydroxyl value acrylic resin and water redecomposible polymer material. It can form the film rapidlly under room temperature, and the film has the performance of high hardness, water resistance, acid and alkali resistance, alcohol resistance, excellent weather resistance and high stain-resistance, including the stain like red wine, strong tea, lipstick, soy sauce, cooking oil. Widely applied in a variety of high-standard and luxury decoration needs.
Resistant to boiling water and various household chemical cleaners
highly scratch-resistant
mildew and moisture proaf
Unique molecular structure, can be constructed twice the same day
good leveling, feel fine
highly stain-resistant, looks new in long time
New wall: Remove dust greasy and loose marl on the surface. If holes are found, repair them promptly to ensure that the wall surface is clean, dry and smooth.
Revonating wall: remove the weak paint film of the old wall, remove the dust powder and impurities on the surface, smooth and polish, clean and dry thoroughly.
Surface status: Ensure that the surface humidity of the pre-coated substrate is less than 10% and the PH value is less than 10. The surface of the pre-coated substrate must be firm, dry, clean, flat and free of loose substances.
DE33-2 orDE33-3Putty-Mate is recommended to use in advance to increase the firmness of the base,
surfaces of interior walls
Mix TQ-11(A):TQ-11(B)together, using a long-handled bristle brush to strongly stir from the bottom to the top for more than 3 minutes, making TQ-11(A):TQ-11(B) is fully mixed, otherwise it will affect the film performance;
The two-component product must be used up within 4 hours after mixing;
Spraying, brushing and rolling construction can be considered.
According to the base condition, 0-20% water (weight ratio) can be added to dilute;
Excessive dilution damages the effect of the coating
touch dry0.5-1 hours
actual dry12 hours
(25℃,relative humidity 70%)
Recoating interval time should be ≥8 hours, the thickness of the paint film should be uniform, no leakage and insufficiency
10-12 m/kg/layer
the coating consumption would be different according to the actual site condition.
Store in a cool, dry place to avoid heat and frost
A shelf life of 30 months if the product is unopened and properly stored.
The two-component product must be used up within 4 hours after mixing;
It is recommended to be transported and stored under the temperature above -5 degrees to avoid freezing deterioration;
Please do not operate in wet or cold weather (temperature below 5 ℃ , relative humidity exceeds 85%), otherwise the expected painting effect can not be achieved.
The quality of the company's products abide by all the requirements of the national quality certification system.
The product should be used under the instruction of the Company, in the event of adverse results because of product mismatching, improper use or abnormal environmental factors, the Company has the responsibility to provide solutions, but does not assume direct and joint liability.
Before purchasing, users need to determine whether this product is suitable for your requirements to avoid waste.
Any quality dispute shall be subject to arbitration by the national quality supervision and testing department.
1.Should be kept out of reach of children;
2.Necessary protection measures should be taken during construction to avoid inhaling dust and splashing into eyes. In case of intaking, wash with clean water immediately;
3.Disposal of waste shall comply with the requirements of relevant environmental regulations.
Mobile: 0757-22891777
Address: Xingtan Town Industrial Park, Shunde District,
Foshan City, Guangdong Province